Skip to content
-----> product

Wiha 77891 11inOne Multi-Driver

by Wiha
Original price $17.98 - Original price $17.98
Original price
$17.98
$17.98 - $17.98
Current price $17.98
Free shipping
Wiha 11inOne Multi-Drivers include 8 essential screwdriver and 3 nut driver tip profiles for efficient tool carry, consist of Wiha premium quality tool steel engineered for strength and durability that feature exact fit precision machined... Read more

Overview

Brand img

Wiha 77891 11inOne Multi-Driver

Wiha 11inOne Multi-Drivers include 8 essential screwdriver and 3 nut driver tip profiles for efficient tool carry, consist of Wiha premium quality tool steel engineered for strength and durability that feature exact fit precision machined tips to reduce cam-out of fastener heads. The nut driver component is chrome plated and the double-ended bits phosphate finished for corrosion protection and surface resilience.
With the Wiha 11inOne Multi-Driver, you have a trusted companion at the ready for nearly any driver application you face on the jobsite or at home. Wiha premium quality 11inOne Multi-Drivers are designed and engineered by Wiha Germany and are made in Monticello, MN - USA under strict Wiha quality standards. You can buy with confidence knowing that the Wiha 11inOne Multi-Driver is backed by the Wiha No Hassle Guarantee.

Multi-Driver means 11 tools in one – a handy tool that saves space in your bag

Features common tips – each bit is double-sided and sports two slotted, two Phillips, two square or two Torx. Also features three nut driver tips

Made in the USA!


Product Details

General Information
Manufacturer
Wiha
Part Number
77891
Product Type
Screwdriver
Physical Characteristics
Tip Type
slotted, phillips, torx, square, nut driver inch
Size
Doubled-ended Slotted 3/16", 1/4"
Double-ended Phillips #1, #2
Double-ended Nut Driver 1/4", 5/16"
Miscellaneous
Packaging
Retail
Country of Origin
United States